Cebu Port Authority Maintenance Dredging
Charter of the MT WV UNO, MV WV DOS and Barge ASEANA 1 to be utilized in dredging project at Pier 3, Cebu International Port.
Dredging up to negative 5 meters, about 20,000 cubic meter of dredge materials are removed and dump at about 32 km from the Cebu International Port (CIP). Project also includes segregation of floating garbage from the dredge area.